Project Reference

 
Hasilwan is proud of the partnerships it has developed with all of its respective clients over the last two decades. Our full staff of experienced, professional engineers has expertise in a variety of fields providing a full range of services.

Our portfolio of clients ranges from all different respective industries from state-owned power utilities, private power utilities, private project developers, various industrial based organizations, independent power producers etc.

We have listed a few selected references which would best describe our services in the past and present. We invite you to contact us if you would like to receive our complete Project Reference List or for details on representative projects that showcases our expertise in power engineering services.


    

  
  PROJECT DESCRIPTION YEAR OF AWARD

Supply and Erect of 275kV & 132 kV Power, Earthing and Local Transformer & Ancillary Equipment for Peninsular Malaysia Transmission Development Mainhead 'A'
1999

Transformer Storage & Maintenance under Contract TNB 292/98 at TNBT Store
2003

Modification of 132 kV GIS Switchgear Cable Box at Dang Wangi and Bukit Mahkamah Substation
2003

Supply, Erect and Commissioning of 132kV Gas Insulated Switchgear and Ancillary Equipment for PMU 132/11kV Malim Jaya Extension
2010

Supply, Erect and Commissioning of 24 units of Tunning Filter Reactors for Asset Maintenance Department - Mainhead A
2011

Supply, Erect and Commissioning of 24 units of Tunning Filter Reactors for Asset Maintenance Department - Mainhead B
2011

Supply, Erect and Commissioning of 24 units of Tunning Filter Reactor for Asset Maintenance Department - Mainhead C
2011

Supply, Erect and Commissiong of 24 units of Tunning Filter Reactor for Asset Maintenance Department - Mainhead D
2011

Supply, Erect and Commissioning of 132kV & 33kV Switchgear, Transformer and Ancillary Equipment, Complete with Civil Works for PMU 132 / 11kV Jambu Rias
2011

Design, Supply, Deliver, Installation & Commissioning of Distribution Remote Terminal Unit (RTU) for Secondary Substation (PE or SSU 11kV)
2011
 
Full Turnkey on Relay Retrofitting Works for PMU Chendering, PMU Kuala Terengganu, PMY Kuala Berang & PMU Kenyir & 132kV Overhead Line Reconfiguration at Loop-In-Loop-Out (LILO) Point to PMU Chendering
2012

Works for PMU 275 / 132 kV Port Klang Extension (1 x 275kV Overhead Line Bay)
2013

Delivery, Erect and Commissioning of 132kV and 33kV Switchgear, Transformer and Ancillary Equipment, Complete with Associated Civil Work for PMU 132 / 33kV Kandis Extension ( 2 x 45MVA), Kelantan
2013

Supply and Delivery of 132kV Tower Lightning Arrester for the usage for Assets Maintenance Office, Transmission Division of TNB
2013
 
Works for PMU Kota Sarang Semut Extension (2 x 45 MVA, 2 x Overhead Feeder (OHF)) and 2nd Circuit Loop-In-Loop-Out (LILO) of 132kV OHL Kota Setar, Gurun (KSTR - GRUN) into PMU Kota Sarang Semut, Kedah
2013

Full Turnkey for Establishment of 132 / 33kV PMU Sg. Ara GIS (2 x 90 MVA) Transmission Substation
2013

Conversion of Existing Spare Bay (SB1) at PMU 275kV Connaught Bridge Power Station Into Generator Bay.
2013

To Complete Balance Scope of Work 275kV System at PMU Bukit Merah, PMU Segari, PMU Air Tawar and PMU Batu Gajah Substation
2014

Supply, Erect and Commissioning of 132kV and 33kV Switchgear with Associated Ancillary Equipment for PMU 132kV/33kV Kuantan Extension Substation
2014

Replacement of High Impedance Busbar Protection with Low Impedance Busbar Protection at PMU Proton and PMU North Klang Straits 
2014

Replacement of Current Transformer At PMU Bukit Tambun And Replacement Of Protection Relays At Related PMUs.
2014

The Survey, Design, Supply, Construction, Testing and Commissioning of Approximately 196km 500KV Transmission Line.
2014
 
Supply, Erect And Commission Of 2 Replacement 60MVAR Shunt Capacitor Bank For Asset Maintenance Johor - Mainhead A.
2014

Supply, Erect And Commission Of 4 Replacement 60MVAR Shunt Capacitor Bank For Asset Maintenance Kuala Lumpur - Mainhead B.
2014

Establishment of New PMU 132/33/11kV Batu Kawan South.
2014

Replacement of 275kV Low Impedance Busbar Protection at PMU 275kV Olak Lampit.
2015

Pembekalan, Pemasangan, Pengujian Dan Memulatugas Field Terminal Unit (FTU) Untuk projek Distribution Automation (DA).
2015

Pembekalan, Pemasangan, Pengujian Dan Memulatugas Field Terminal Unit (FTU) Untuk Projek Bahagian Pembahagian.
2015

Replacement of Substation Control System at PMU Gurun East (GRNE) 275kV and 132kV for Asset Maintenance (Pulau Pinang), Transmission Division, TNB.
2015

Delivery, Installation, Testing & Commissioning of Solar Grid Connected System At TNB Buildings.
2015
 
Supply, Delivery, Installation, Testing & Commissioning of Solar Grid Connected System At Jabatan Kebajikan Masyarakat Buildings.
Zone 1: Perak, Pulau Pinang, Kedah, Perlis, Selangor And Sabah.
2015
   
 
Supply 6 units of 132kV and 275kV Transformer of various capacities complete with accessories to Bukit Sentosa Warehouse
2016
 
Installation of 12kW Solar system at Bandar Puteri, Puchong Individual shop lot.
2016
 
Supply, Erect and Commissioning of 132kV Switchgears, Shunt Capacitor Banks and Ancillary Equipment with Associated Civil Works for 1 X 60MVAR Capacitor Bank at PMU 132kV Setia Alam, Selangor
2016
 
Supply, Erect and Commissioning of 132kV Switchgears, Shunt Capacitor Banks and Ancillary Equipment with Associated Civil Works for 1 X 60MVAR Capacitor Bank at PMU 132kV Kampong Cempaka, Selangor
2016
 
Protection Relay Replacement (Supply,Install,And Commissioning) Of Selected 500 KV,275KV & 132KV,Bays For Asset Maintenance Department,Transmission Division (Phase 1A) For Mainhead B: Joh-1 Johor Baharu,KL,N.Sembilan And Pahang
2016
 
Supply, Delivery, Installation, Testing & Commissioning of Solar Grid Connected System At Jabatan Kebajikan Masyarakat Building Phase 2 , Zone 4 
2017
 
Supply, Delivery, Installation, Testing & Commissioning of Solar Grid Connected System at Jabatan Kebajikan Masyarakat Buildings Phase 2 Zone 1
2017
 
Bekalan Elektrik Luar Bandar (BELB) Project in POS, Poi Sungai Siput Phase 2, Perak
2017
 
Implementation Of Protection Upgrade And Associated Works For The Whole Sabah Grid Network -Transformer Protection For Penampang 132/66KV
2017
 
Pembekalan, Pemasangan Pengujian Dan Mulatugas Secondary Remote Terminal Unit (RTU)
2017
 
Pembekalan, Pemasangan Dan Pengujian Fasiliti Distribution Automation (DA) Untuk Wilayah Timur & Pulau Langkawi
2017
 
Balance Of Work To Complete For  PMU 132/33KV Mahkota Cheras, Selangor
2017
 
Implementation Of Protection Upgrade And Associated Works For The Whole Sabah Grid Network –Intelligent Load Shedding Scheme (ILSS) For Transmission Transformers
2017
 
Implementation Of Protection Upgrade And Associated Works For The Whole Sabah Grid Network - Reverse Blocking Scheme

 
2017
 
 